The primary damage in the l911 church is from |
|
leaky roofs. A new roof is an immediate need. |
|
Stopping the leaks in the hall next to the |
|
Fireplace Room is the most critical, as these leaks |
|
have caused rot and staining to the beams below. |
|
Recent temporary repairs have helped, but |
|
some leaks remain. |
|
|
|
A Roof Fund |
|
has been established to replace |
|
the leaking roofs in the Sunday School and for the seismic |
|
strengthening of the south Sunday School wall. |
|
Before we re-roof, we must have an engineering study to |
|
aid in the roof design. And then we need to proceed |
|
to re-roof the magnificent auditorium itself. |
|
|
|
Your financial support is needed.
|
|
|
|
|
|
| OTHER PRIORITY NEEDS: |
Seismic evaluation and repair, |
|
repair of windows and doors, |
|
repair of concrete spalling, |
|
treatment and repair of some of the exterior wood, |
|
code upgrades including ADA, |
|
are among the other priority preservation needs identified in the Historic |
|
Structure Report. |